207.1(2)Notwithstanding the time frame specified in clause 4.3.2.2(d) of CSA standard Z150-98, “Safety Code on Mobile Cranes” for an inspection of a telescopic boom, an employer and an owner of a mobile crane shall each ensure that a mobile crane undergoes a complete structural inspection of its telescopic boom in accordance with CSA standard Z150-98, “Safety Code on Mobile Cranes” in accordance with the following time frame: