22(1)The Corporation shall, as soon as practicable after the commencement of this section, file with the Board a list of system elements that fall within the previous definition of bulk power system, and until June 30, 2016, the Corporation shall file with the Board a document setting out any addition to or deletion from the list as soon as practicable after becoming aware that the addition or deletion is required.