Acts and Regulations

2013-66 - Reliability Standards

Full text
System elements
Repealed: 2021, c.42, s.41
2021, c.42, s.41
22Repealed: 2021, c.42, s.41
2021, c.42, s.41
System elements
22(1)The Corporation shall, as soon as practicable after the commencement of this section, file with the Board a list of system elements that fall within the previous definition of bulk power system, and until June 30, 2016, the Corporation shall file with the Board a document setting out any addition to or deletion from the list as soon as practicable after becoming aware that the addition or deletion is required.
22(2)The Corporation shall, as soon as practicable after the commencement of this section, file with the Board a list of system elements that make up the bulk power system as defined in section 2 and shall file with the Board a document setting out any addition to or deletion from that list as soon as practicable after becoming aware that the addition or deletion is required.
System elements
22(1)The Corporation shall, as soon as practicable after the commencement of this section, file with the Board a list of system elements that fall within the previous definition of bulk power system, and until June 30, 2016, the Corporation shall file with the Board a document setting out any addition to or deletion from the list as soon as practicable after becoming aware that the addition or deletion is required.
22(2)The Corporation shall, as soon as practicable after the commencement of this section, file with the Board a list of system elements that make up the bulk power system as defined in section 2 and shall file with the Board a document setting out any addition to or deletion from that list as soon as practicable after becoming aware that the addition or deletion is required.