147(5)The Corporation may apply for approval of changes to the transitional transmission tariff until a new transmission tariff is approved or fixed under subsection 113(12), and subsections 113(2), (5), (8), (9) and (13) and section 127 apply, with the necessary modifications, for the purposes of this subsection.