( a) in relation to a TOD Regular attraction sign or a TOD tourist/visitor information sign | |
| |
(i) for a primary identification sign | |
| |
(A) for manufacture and installation by the Minister | $600.00 |
| |
(B) for maintenance, per year | $100.00 |
| |
(ii) for a follow-up sign | |
| |
(A) for manufacture and installation by the Minister | $210.00 |
| |
(B) for maintenance, per year | $40.00 |
| |
( b) in relation to a TOD Major attraction sign | |
| |
(i) for manufacture and installation by the Minister: reasonable cost to the Province | |
| |
(ii) for maintenance by the Minister: reasonable cost to the Province | |
| |
( c) in relation to a TOD Secondary attraction sign | |
| |
(i) for manufacture and installation by the Minister | $6,000.00 |
| |
(ii) for maintenance by the Minister: reasonable cost to the Province | |
| |
( c.1) in relation to a TOD Fingerboard sign | |
| |
(i) for manufacture and installation by the Minister | $200.00 |
| |
(ii) for maintenance, per year | $50.00 |
| |
( c.2) in relation to a TOD Highway logo sign | |
| |
(i) for manufacture and installation by the Minister, per business for each logo on the sign | $3,000.00 |
| |
(ii) for maintenance, per business for each logo on the sign, per year | $300.00 |
| |
( c.3) in relation to a TOD Ramp logo sign | |
| |
(i) for manufacture and installation by the Minister, per business for each logo on the sign | $1,000.00 |
| |
(ii) for maintenance, per business for each logo on the sign, per year | $300.00 |
| |
( d) in relation to a private advertisement, for site visit by the Minister upon application | $75.00 |