( c.2) ![]() in relation to a TOD Highway logo sign | |
(i) ![]() for manufacture and installation by the Minister, per business for each logo on the sign | $3,000.00 |
| |
(ii) ![]() for maintenance, per business for each logo on the sign, per year | $300.00 |
| |
( c.3) ![]() in relation to a TOD Ramp logo sign | |
| |
(i) ![]() for manufacture and installation by the Minister, per business for each logo on the sign | $1,000.00 |
| |
(ii) ![]() for maintenance, per business for each logo on the sign, per year | $300.00 |
| |