Acts and Regulations

96-105 - Underground Mine

Full text
Hoisting machinery inspection
259(1)An employer shall ensure that after every six months of service on a drum hoist, the portion of the hoisting rope that is within the clamps at the attachment of a shaft conveyance or counterweight is cut off.
259(2)An employer shall ensure that after every eighteen months of service on a friction hoist, the portion of the hoisting rope and tail rope that is within the wedge and socket attachments is cut off.