Acts and Regulations

96-105 - Underground Mine

Full text
Testing of electric blasting circuit
151Before connecting an electric blasting circuit to the lead wires and before connecting the lead wires to the power source, a person who conducts an underground blasting operation shall ensure that the electric blasting circuit is tested with a blasting meter for continuity and resistance as calculated.