Acts and Regulations

96-105 - Underground Mine

Full text
Testing of electric detonators
150Before a blast is fired, a person who conducts an underground blasting operation shall ensure that electric detonators are
(a) tested for continuity with a blasting meter before being used, and
(b) shunted or short-circuited after being tested until they are connected in circuits.