Acts and Regulations

2014-97 - Boiler and Pressure Vessel Act

Full text
NEW BRUNSWICK
REGULATION 2014-97
under the
Boiler and Pressure Vessel Act
(O.C. 2014-287)
Filed August 12, 2014
1The enacting clause of New Brunswick Regulation 84-175 under the Boiler and Pressure Vessel Act is repealed and the following is substituted:
Under section 40 of the Boiler and Pressure Vessel Act, the Lieutenant-Governor in Council makes the following Regulation:
2Section 6 of the Regulation is amended
(a) by repealing subsection (1) and substituting the following:
6(1)The owner of a guarded plant shall provide the boilers with protective devices satisfactory to the Chief Inspector.
(b) in subsection (2) in the portion preceding paragraph (a) by striking out “prescribed in subsection (1)” and substituting “referred to in subsection (1)”.
3Subsection 8(1) of the Regulation is amended by striking out “have the main steam-line or hot water line disconnected” and substituting “have the boiler disconnected”.
4Subsection 19(5) of the Regulation is amended by striking out “and his decision is final”.
5Section 21 of the Regulation is amended
(a) in paragraph (a) by striking out “and notify the owner of the measures taken”;
(b) in paragraph (d) by striking out “and maintained at all times as required”.
6Paragraph 22(d) of the Regulation is amended by striking out “and maintained at all times” and “as required”.
7Paragraph 23(b) of the Regulation is amended by striking out “and maintained at all times”.
8Paragraph 27(c) of the Regulation is amended by striking out “subsection 8(5)” and substituting “subsection 8(4)”.
9This Regulation comes into force on October 1, 2014.