14.01(1)Before starting work involving the installation, extension, renewal or repair of a series of ten or more plumbing systems, the plumbing contractor performing the work shall obtain a special plumbing permit from the chief plumbing inspector instead of a plumbing permit for each installation as required under subsection 13(1).